重考一次 PDD,等於再付一次報名費,還要再花好幾週重新準備。與其承擔重考成本,不如先用 KaoGuTi 的 102 道練習題,把 NCARB ARE 5.0 Project Development and Documentation 的每個領域練熟再上場。
NCARB PDD 考試概覽:
| 認證廠商: | NCARB |
|---|---|
| 考試名稱: | ARE 5.0 專案發展與文件製作 |
| 考試代碼: | PDD |
| 考試時間: | 225 分鐘 |
| 考試形式: | 熱點題, 拖放題, 選擇題 |
| 考試費用: | 250美元 |
| 實際考試題數: | 85-100題 |
| 及格分數: | 依測量學標準調整而有不同 |
| 證照有效期限: | 自完成所有ARE考試科目起算,有效期10年 |
| 支援語言: | 英文 |
| 相關認證: | ARE 5.0 (建築師註冊考試) 註冊建築師 |
| 範例考題: | ![]() |
| 考試方式: | 於Pearson VUE考場採用電腦測驗方式應考 |
| 必備條件: | 報考PDD科目無強制先修規定,但建議先完成執業管理科目(PM)再應考 |
| 官方大綱網址: | https://www.ncarb.org/are/ARE5.0 |
NCARB PDD 考試大綱主題:
| 章節 | 權重 | 目標 |
|---|---|---|
| 建築法規分析 | 15-20% | - 法規符合性評估
|
| 施工圖說文件製作 | 15-20% | - 技術文件編製
|
| 細部設計發展 | 20-25% | - 設計方案深化
|
| 初步設計發展 | 20-25% | - 設計概念發展
|
| 基地分析與環境考量 | 10-15% | - 基地環境評估
|
| 專案範疇與需求 | 15-20% | - 計畫需求分析
|
關於 PDD 考試,考生最常問的問題
PDD 是由 NCARB 推出的認證考試,正式名稱為「ARE 5.0 專案發展與文件製作」,通過後即可取得 Architect Registration Examination 認證。此認證屬於 中級 等級,主要用來驗證考生在相關技術領域的專業能力,對求職與升遷都有實質幫助。與本考試相關的認證還包括 ARE 5.0 (建築師註冊考試)、註冊建築師,可依個人職涯規劃逐步進修。若你正準備報考 PDD,KaoGuTi 的練習題能幫助你更快掌握考試重點。
PDD 考試的題量為 85-100題 題,考試時間為 225 分鐘。在有限的作答時間內,每題能停留的時間其實不多,答題節奏的掌握格外重要。建議作答時不要在單一題目上糾結過久,遇到不確定的題目先標記起來,全部答完再回頭檢查。考前不妨使用 KaoGuTi 的模擬試題進行幾次限時練習,實際體驗在 225 分鐘 內完成作答的節奏感,正式上場時時間分配會更有把握。
PDD 考試的及格分數為 依測量學標準調整而有不同,官方報名費為 250美元。需要留意的是,若未能一次通過,重考必須再次全額支付報名費,加上等待與重新準備的時間,成本其實不低。建議正式報名前,先以 KaoGuTi 的 102 道練習題完整自我檢測,確認答題表現穩定超過及格標準後再預約考試,避免不必要的重考支出。
報考PDD科目無強制先修規定,但建議先完成執業管理科目(PM)再應考 報考條件可能隨官方政策調整,建議報名前再到 NCARB 官方考試頁面 確認最新規定,以免錯過任何變更。
可以。KaoGuTi 提供 PDD 免費範例試題(Free PDF Demo),內容取自正式題庫,下載後即可實際檢視題目與答案解析的品質,滿意再購買。購買正式版後享有 365 天免費更新,題庫內容會隨考綱調整同步修訂;365 天到期後如需繼續更新,還可享有 50% 的續更折扣。
KaoGuTi 提供退款保證:購買後 60 天內參加 PDD 對應考試而未通過,可申請全額退款。申請時需提交報名證明(准考證/enrollment slip)複印件與官方成績單(Score Report)PDF,並於考後 2 天內提出,我們會在 7 天內處理完成。請注意,購買後 3 天內即參加考試、已下載但未實際應考、免費資料與過期訂單均不適用退款保證,且考生姓名須與付款人姓名一致。若不想退款,也可以選擇免費更換為兩個等值考試資料,並保留原購產品的更新服務。
交付方面,付款完成後系統會在一分鐘內將產品下載連結寄至你的電子郵件信箱,可立即下載開始準備;若 2 小時內未收到,請聯絡客服協助處理。產品不限制安裝的電腦數量,桌機、筆電都能自由使用。
PDD 考試大綱共分為 6 個主要領域,包括:
- 初步設計發展(佔比 20-25%)
- 專案範疇與需求(佔比 15-20%)
- 建築法規分析(佔比 15-20%)
完整的大綱內容與各領域細項,請參考本頁上方的考試大綱區塊,建議逐條對照自己的熟悉程度,安排複習的優先順序。
最新的 Architect Registration Examination PDD 免費考試真題:
問題 #1
An architect is coordinating the mechanical and structural systems in a building with exposed ceilings. The HVAC ducts are interfering with a large concrete beam in the open office area.
A. Increase the ceiling height
B. Relocate the beam to accommodate the ductwork
C. Request the mechanical engineer to reroute the ductwork
D. Shift the HVAC ducts below the beam
問題 #2

Refer to the exhibit.
What set of conductors should the building fluorescent Lighting be connected to?
A. C,N
B. C, A, B
C. A, B
D. C,A,N
問題 #3
A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.
Key project information includes:
* Brewing and distilling will operate year-round.
* Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.
* Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.
* Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.
* Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.
* The Market area will feature local farm products and is not conditioned.
* Entire building will be fully sprinklered.
* Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.
* Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.
* Public water and sewer is not available at the Project Site.
* Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.
The following resources are available for your reference:
* Architectural Drawings, including plans, elevations, sections, and schedules
* Consultant Drawings, including structural, HVAC, power distribution, and plumbing
* PEMB Shop Drawings
* Design and Construction Schedule
* Specification Excerpts, showing relevant spec sections
* IBC and ADA Excerpts, showing relevant code and accessibility sections
* After reviewing the documents, the architect discovers a coordination issue in the corridor.
The owner has revised the pro forma and directed the architect to add two additional Type B units to the design. A code review for the project indicates that the building occupancy is R-2.
What should the architect do to meet the owner's required revisions?
A. Change the 10th Floor Unit 2BR-E to two 1-bedroom units and change the 7th Floor Unit 2BR-E to two
1-bedroom units.
B. Change the 2nd Floor Unit 1BR-SW into two studios and change the 10th Floor Unit 2BR-E to two 1- bedroom units.
C. Change the 5th Floor Unit 2BR-E to two 1-bedroom units and change the 2nd Floor Laundry to a 1- bedroom unit.
問題 #4
In which of the following locations should wood building products be pressure treated when used in a climate that promotes decay? Check the four that apply.
A. Wood siding closer than 6 inches to exterior finish grade
B. Wood window casing less than 24 inches above grade
C. Wood members used in conjunction with roofing or flashing
D. Wood doors in contact with thresholds
E. Wood members in contact with masonry or concrete
F. Wood members at grade, below grade, or less than 8 inches above grade
問題 #5
What is the primary purpose of shop drawings?
A. Define design intent
B. Replace construction drawings
C. Document record drawings
D. Illustrate fabrication and installation methods
問題與答案:
| 問題 #1 答案: C | 問題 #2 答案: A | 問題 #3 答案: A | 問題 #4 答案: A,B,E,F | 問題 #5 答案: D |

984 位客戶反饋 







175.156.128.* -